hpmHPM  HPM

About HPM
|
Services
|
Projects
|
Clients
|
Contact Us
|
Engitect
|
HPM Archives
|
Home

You are here: Home > Services > Consultancy > Bell Towers and Movement Monitoring

Bell Towers and Movement Monitoring

Hurst Peirce + Malcolm have advised on bell towers and their suitability to carry full swing bell frames since the 1930's. We are often asked to advise on the effect of lowering the bell frame or changing the arrangement of bells.

Recent commissions have included the complete restoration of a 14th Century timber framed tower and spire in Kent and advising on the condition of a tower in Charleston, USA.

Your description here

We have developed bespoke vibration monitoring equipment to measure the movement of bell frames and towers. This allows us to determine where improvements can be made in the quality of the ring.

Typical plot from our in-house designed equipment for measuring the movement of church towers.





Charleston, USA

An 1820 brick built, stuccoed church where we have been assisting the local engineer in considering the stability of the tower which sank 200mm during an earthquake in 1896.

Construction techniques were similar to those of the UK for the same date.





Brasted, Kent

A bell tower where it was proposed to increase the number of bells from six to eight.

Hurst Peirce + Malcolm were asked to advise on whether this change would have an adverse effect on the Kentish Ragstone tower which did have a number of cracks.

We recommended some simple strengthening to be installed at the same time as the modifications to the bell frame.





Cowden, Kent

A fourteenth century timber framed tower and spire. We were originally asked to advise on the effect of lowering the bells in the tower to make a better ring.

Our inspection revealed that the tower had been severely weakened by earlier attacks of death watch beetle resulting in loss of up to 75 percent of the cross section of some members.

As a result a £170,000 contract was required to restore the tower and spire before the bells could be lowered.

Vibration monitoring of the tower was employed to confirm the beneficial effect of strengthening the tower and lowering the bells.



    Hurst Peirce + Malcolm LLP, Celtic House, 33 John's Mews, London WC1N 2QL
    Registered in England & Wales, Reg No. OC307252

    Tel: 020 7242 3593 Fax: 020 7405 5274

    Email: enquiries@hurstpm.co.uk

    Ecommerce Website Design LondonEcommerce Website Design London